Our 07:25 wake up call this morning came from Riney. The people installing the temporary tarmac ramp said they had been told to start at 07:30 and that it was OK because this was an emergency. It was an emergency because pedestrians needed a ramp while water works in the tunnel were happening.
They could not explain why it was an emergency at 07:25 this morning rather than over the last few days during which the state of the works has remained unchanged.
|
An "emergency" ramp being installed. |
1 comment :
Email environmental health and ask them why it was an emergency. It would be they who gave permission.
Jane Smith