The BEO report on the meet the water tank contractors event.

A key point is #4:  Look out for the letter giving the date the supply to your flat will be affected, and on that day do not use the non-potable cold water supply; doing so may introduce air-locks which need manual intervention to fix.  The potable water supply (i.e. the kitchen tap) will keep working as normal.

From the BEO:
___

Water Tank Works: Meet the Contractor
The 'Meet the Contractor' meetings took place earlier in the week and below are a few points which were raised.
  1. The water supply in the bathrooms are tank fed, the kitchen is mains supply and will not be affected. The water from the bathroom is not suitable for drinking.
  2. The contractors will hand drop letters to the flats 1-2 weeks in advance of the work to be conducted.
  3. The bathroom water supply will be switched off from 9-5 pm on the day/days of work.
  4. Please DO NOT open taps on the days of work between 9 - 5 pm as this can create air locks and further issues.
  5. Please be aware that the suggested stickers for taps will NOT be provided by the estate office and it is the responsibility of residents to ensure the bathroom taps are not used during the time of work on the day/days of work.
  6. The Clerk of Works will inspect and sign off all work after completion.
  7. Omissions will be removed from the costs.
  8. Access will not be required to any properties.
The full schedule of the works can be found here.