Made worse by a water accident |
I’m currently dealing with various internal cracks at Ben Johnson in all floors with a Structural Engineer and a Specialist Contractor. The Engineer has produced a survey report for the cracks. We met this morning discussing the various options in the report on remedying the problems in order to put together costs. The two flat cracks have been covered by the report and would be part of the works. Although it is internal the works may involve Planners as it is a listed building. My next action is to lead the project team to meet with Planners asap to discuss way forward.