Showing posts with label roofs. Show all posts
Showing posts with label roofs. Show all posts

Tuesday, 13 February 2024

Temporary Window Repairs

From the BEO:

Dear Residents,

Please see attached communication updates from the Barbican Project Manager, Graham Sheret, with regard to temporary window repairs to your three blocks.

This work will start tomorrow, Wednesday 14 February, on John Trundle Court and Bunyan Court. The team intend to complete the temporary repairs within 4 weeks. Please note this work is weather dependant.

Wednesday, 27 March 2019

House Group Objects to the Antennae

BJHG Objection to the proposed antennae atop the arts centre from the chair of the house group:
___

Although I have already submitted an individual objection, this objection is on behalf of the Ben Jonson House Group, of which I am Chair. We object strongly to the proposal for the following reasons:

  1. The listed status of the Barbican buildings and Grade 2* listing of the Barbican estate exist to protect them from damaging changes. Residents are subject to very strict controls about permitted alterations both internally and externally. To use a widely acclaimed icon of mid-century architecture as a support for technical equipment is totally at odds with the listing intentions. It would also set a very dangerous precedent regarding any future proposals.
  2. The fact that the masts will project 3.4 metres above the roofline means that they will be visible across the estate from apartments at the same height or higher. They will be detrimental to the outlook of residents.
  3. The potential threat to health must not be understated. The lack of conclusive proof that such installations are a health threat should be balanced against the lack of conclusive proof that they are not. In the USA the Federal Communications Commission (FCC) recommends 457 metre setback for wireless infrastructure near schools. The FCC felt there was a strong case for “prudent avoidance” because the development of wireless technology was outpacing research on the health impacts. This applies particularly to 5G. In this case not only are the Golden Lane Campus and the City of London School for Girls closer than recommended, but there are apartments, occupied day and night, as close as 30 metres away.
  4. The proximity of residential buildings is not referred to in the application, but Ben Jonson House and 5 other Barbican blocks of flats are all located within about 100 metres of the installation. This equates to several hundred flats and large numbers of residents.
  5. No recognisable public consultation was held prior to submitting this application, in spite of its likely impact.

Saturday, 9 March 2019

Phone Masts Proposal - BEO Notice

The BEO have sent out a notice about the proposal to install transmission equipment atop the Barbican Theatre fly tower.

The date for responses appears to have been pushed back to 29th March, and the BEO have included a very handy link direct to a page where observations and objections can be submitted.

From the BEO:
___

Public Notice of Proposed Works / Development

Deadline for Commenting on this Application: 29 March 2019

PLANNING (LISTED BUILDINGS AND CONSERVATION AREAS) ACT 1990
TOWN AND COUNTRY PLANNING ACT 1990

Proposed Development/Works at: Barbican Arts and Conference Centre Silk Street London EC2Y 8DS

I give notice that CTIL is applying to the City of London for planning permission for the following:

Installation of 18 antennae, four dish antennae, eight equipment cabinets and ancillary development thereto.

The proposal affects a building of Special Architectural or Historic Interest and the character and appearance of the following Conservation Area: Barbican and Golden Lane

Please click here for further information, the details of the application can be found here. Please make your comments or observations here.

Sunday, 3 March 2019

Phone masts on the Barbican - update

Object by 29th March

Here is an update on the matter of the proposal to install phone masts on the high point of the arts centre.  See this previous post for pictures of where it will be.

Below an update from the chair of the BA planning sub-committee.  If you  would like to object to the proposed masts you can email the planning team at plans@cityoflondon.gov.uk or visiting the City planning website, planning reference numbers 19/00108/FULL and 19/00109/LBC (LBC is Listed Building Consent application).
___

I remain concerned however about the application from CTIL (Vodafone and O2) that I highlighted last week i.e. the application to install a raft of mobile transmission equipment on the roof of the Barbican Centre. Whilst this may be a very personal view (and therefore apologies to those who think it is a good idea) the more I think about this application the more outrageous it becomes. There is very scant information provided with the application (no acknowledgement of it being a Grade II" listed estate for example) and what there is, in my view, is misleading ie. it infers that there was a proper pre-application consultation process and that there were no comments received from those consulted. We know this not to be the case as the BA did indeed write a letter to CTIL voicing its objections very clearly. The breach of listed building guidelines and possible health issues are also notable by either their absence or platitudes. .

My concern is that this application has been submitted in the hope that it will not be picked up and that inertia will prevent enough objections being lodged. Indeed only 9 objections have been lodged with the Planning Dept to date. I have therefore taken the liberty of drafting an email which you, as House Chairs, could send out to your fellow residents with a request that as many as possible lodge their objections before the standard consultation expiry date of 11th March 2019. Please feel free to make any amendments - or to just ignore it!

click to read the whole message