In their recent "Community Newsletter" for the 1 Golden Lane project, Midgard present the following table:
On the face of it these sound levels look fine, you'd think. But look closer. Midgard are giving measures using LAeq10 Hours in plain old dB ... this is about the best way to hide noise nuisance while coming across as all clever and technical. But ...
LAeq (Equivalent Continuous Sound Level) is a flawed measure of sound nuisance which hides problematic peaks by averaging sound energy over long periods. The LAeq 10h measure used by Midgard averages over 10 hours, no doubt including the “Reduced impact hours” in the average.
Limitations of LAeq in more detail:
In the "1 GOLDEN LANE EC1Y 0RR - Community Newsletter – May 2024" the contractors give the times they will be working during the rest of the project:
| Click to read the whole newsletter |
Noisy pavement work started this morning in front of 1 Golden Lane (which was the UBS building).
The City must have at least given the go-ahead for this.
Did they bother to let nearby residents know in advance?
Nope.
Good morning,
As you may have seen we have been demobilising on the 1 Golden Lane site as our phase of works are now complete. We officially left the site on Friday 23rd February 2024.
At this moment in time, the contractor that will be carrying out the next phase of works at 1 Golden Lane has not been confirmed. However once confirmed we will have a handover where things including neighbourly matters and sensitive receptors will be discussed.
In the meantime, if you need to contact anyone regarding 1 Golden Lane, please contact Thomas Woolf, t.woolf@gardiner.com.
Please can you confirm If you would like me to pass on your email address to the client so they can give it to the next contractor, to include their mailing list. Until we receive approval from you, we will not share your email address.
Finally, I would like to say a huge thank you for your patience, understanding and feedback whilst we have carried out our work. We appreciate fully how our works impacted you at times, and by incorporating your feedback we have remained committed to carrying out our project in the least impactful way possible.
It has been lovely speaking to and meeting with so many of you and I wish you the best for the future.
Thank you from the whole of the McGee 1 Golden Lane team!
Kind regards
The redeveloped 1 Golden Lane will be much bigger, and more intrusive, than the current building.
Planning permission for the proposed redevelopment has been submitted (see the notice here).
You have until 5th May to make representations. If you object to the plans make sure you include the word "object" in your objection otherwise it will be taken as merely a comment.
Send your representations to PLNComments@cityoflondon.gov.uk
I have also received a flyer which gives a good sense of just how much bigger the proposed building will be: higher by no less than 20.39 meters (66.89 feet). The flyer also points out that the proposed building will built out to be closer to Ben Jonson House, that there will be new entertainment terraces, and that refuse containers will be placed immediately in front of Ben Jonson House.
| Click to read the whole flyer |
With UBS having vacated 1 Golden Lane, the building is to be redeveloped. It is not clear yet exactly what "redeveloped" means, whether largely demolished and rebuilt as something else or merely cleaned up and re-fitted, but the first step is to strip-out the current internal fittings and drill some boreholes to study the ground beneath the building.
The work will be done by a firm called KpH who are, of course, considerate contractors. Work details for the project were explained in the following letter and flyer, along with project contact details.
| Click to read the letter and flyer |
Here are the contact details from the letter ...
Borehole work by A2:
Strip-out work by KpH:
Here's hoping the boring is boring and they don't find any lingering WWII ordinance!
Update ... here is the text of an email received by the house group on this topic
___
Dear Stakeholder,
I am writing to you to inform you of the Soft Strip Out and Borehole works that are due to commence at 1 Golden Lane from January 2022. I would be very grateful if you could pass this information on to anyone living in proximity to 1 Golden Lane so that they can also be fully informed.
The Strip Out work will be confined to internal, non-heritage elements of the building to ensure noise, dust and other disruption will be kept to a minimum. Removing the internal finishes in the building at this early stage will provide a comprehensive understanding of the existing building to allow the proposal to maximise re-use opportunities and ultimately reduce the programme duration of the development and any disruption to our neighbours.
Borehole works will commence on Wednesday 12th January and run for approximately 5 business days until Tuesday 18th January. The Soft Strip Out works will commence on Monday 17th January and are expected to be complete at the end of March 2022.
The following works have been planned:
A builders yard has been established beneath Ben Jonson House in support of works happening on Fann Street.
The builders yard is shown in the image below which shows Golden Lane from beneath Ben Jonson House up to, and beyond Fann St.
There are temporary huts on the west side of Golden Lane close to the main exhibition hall entrance, on the other side of Golden Lane there is a waste storage area.
Waste is taken from the work site on Fann St to the street beneath Ben Jonson House by a dumper truck (which you can see heading south in the image). The dumper truck tips the waste on the road. A waste lorry (parked next to the waste heap in the photo) uses a grabber to scrape up the waste and load into the back of the lorry. The lorry scrapes up the waste which is there when it arrives and then hangs around, engine running, while the dumper truck makes additional trips until the lorry is full.
The newly blocked junction between Beech St and Golden Lane is clearly a very handy place for 'considerate contractors' to dump their stuff.
Is this a wild-cat builders yard or has the City approved it? Either way, what was the process by which the area beneath our homes was chosen to host this noisy yard, and why has this come as (yet another) complete surprise?
![]() |
| The yard in action |
| They'll look like this |
Once again the Golden Lane Campus is running into planning issues. This time the school have added structures to eastern play areas, including a pergola. They did this without bothering with the planning process and have now applied for retrospective planning permission as explained in a letter from Islington council:
![]() |
| Click to read the whole letter |
One would expect that a retrospective application would have a higher bar to reach for approval (to discourage people from deliberately asking for forgiveness rather than permission in advance) so it unfortunate that the school did not do the right thing in the first place. Let's hope that the amenity for the children (and indeed local residents) is not compromised by this mistake.