Showing posts with label Golden Lane Campus. Show all posts
Showing posts with label Golden Lane Campus. Show all posts

Saturday, 30 April 2022

Golden Lane Campus - Another retrospective application

 The Golden Lane Campus is yet again making a retrospective planning application.  It would seem that there is no incentive for them to do otherwise, no danger of having to undo the work, no danger of a fine for the individual decision makers.  Why bother with the hassle of fighting for permission to do a thing when you can just do the thing and get it approved afterwards?

In this case the retrospective application is for play structures.

While we most certainly should think of the children, we should also think about the wider context including neighboring residences and, you know, following the boring old planning rules/laws.

I hope the children do indeed end up with good play facilities, but I also hope that the Islington planning team recognise the habits of the school regarding retrospective applications and take action to discourage it.

Click to read the whole document


 

Saturday, 3 April 2021

School Pergola - retrospective planning permission sought

Once again the Golden Lane Campus is running into planning issues.  This time the school have added structures to eastern play areas, including a pergola.  They did this without bothering with the planning process and have now applied for retrospective planning permission as explained in a letter from Islington council:

Click to read the whole letter

Any comments must be in by 2021-05-02.  See P2021/0328/FUL on the Islington planning web site.

One would expect that a retrospective application would have a higher bar to reach for approval (to discourage people from deliberately asking for forgiveness rather than permission in advance) so it unfortunate that the school did not do the right thing in the first place.  Let's hope that the amenity for the children (and indeed local residents) is not compromised by this mistake.

Friday, 1 November 2019

A Meeting with Prior Western School

Here are some notes from a meeting between house group members and representatives of the Prior Western School which occupies a large part of the Golden Lane Campus.
___

We met with Helen from the Governors board, and the new head teacher Fiona McCorquerdale.

Key points:

The new lighting on the playground

This was installed over half term, and 8 lights have been installed, rather than the approved 4 in the planning application. Fiona is querying this with the planning and installation teams and will come back to us on the outcome.

There have been no complaints from residents so far regarding the new lighting.

The lighting is on a timer, currently set to 6.15 to 8pm. There is an over-ride switch and the school intend that they pitch should only be lit when it is in use. So a sensor may be installed for this purpose.

Resurfacing of the pitch and noise reduction
The pitch and parts of the wall facing the lower Cloudsley School have been covered with AstroTurf, and this has meant a 25% reduction in the noise levels. This is complemented by the sound reducing walls and the installation of larger goals so that the rattling sounds from the goal posts is much reduced. The school are looking to raise the height of the ivy walls in places and any new walls that are to be installed will probably be higher than these ones we currently see.

Improvement Plans for the school
Fiona and the school board are looking to replace the existing play equipment with something more in tune with the children's needs. Previous plans have been rejected by parents committees as they were too plastic based, and the plans overall were disjointed. New submissions have been requested from several companies - with the requirement of being Eco friendly, and having an overall theme for the whole school area. These will be shown to the residents committee when they are received and reviewed by the school board. The new plans are to include a whole new planting scheme for the school with increased levels of greenery to be put in place.

Use of the School building
The school are looking at increasing the community use of their building - they are aware of the lack of local amenities for groups wishing to have a space to meet, often with a need for space for movement - dance, exercise etc. They are keen to open the school to the local community here in the Barbican area.
They are currently putting together a 'lettings policy statement' to ensure that the use of the building is sensitive to the school and the local residents. Part of the letting policy will cover the use of the floodlit pitch - the times to be used, and by whom. They will be sharing the draft of this policy with the residents groups as soon as they have it written, and are willing to attend house committee meetings to discuss in detail.

Termly meetings with the school are to be put in the diary - to be attended by Ben Jonson, Breton and any other house that may develop an interest in the school's activities. Next meeting to be in January 2020.

Sunday, 27 October 2019

Golden Lane Campus Floodlighting: How many lights?

In February the Golden Lane Campus was given planning approval for the installation of flood lighting.  Given permission for 4 powerful light fittings, it seems the school has actually had 8 installed.

What the plans said
What the plans said to make it clear

What was actually installed ... Not 4 but 8

Tuesday, 12 February 2019

Golden Lane Campus - Flood Lighting Approved

The long running process of the Golden Lane Campus applying for permission to install flood lighting on rooftop playing areas has reached a conclusion.  The application has been approved.

From the chair of the Ben Jonson House Group:
___

Dear all,

I attended the planning meeting at Islington Town Hall last night along with about 7 other objectors from both Breton and Ben Jonson. 3 of us spoke followed by 2 speakers on behalf of the applicants, a spokesman from the lighting firm and a parent. The councillors decided that the outdoor exercise needs of the pupils took precedence over our concerns and so granted permission for the floodlighting.

It is very disappointing that the installation of a green wall to mitigate noise was dismissed as ineffective and that our petition for use to be limited to 6 pm or 6.30 at the latest was dismissed because permission has already existed from the start for use of the MUGA to 8pm. Although the school does not currently exercise this right in the daylight hours of summer, the Headteacher said this was only because they could not offer the same facility to pupils in winter.

It is the case that the school was trying to raise funds for a green wall to address air pollution, so there may still be some mileage in supporting that initiative, which has the backing of Islington's environmental team because pollution levels at the school are above the recommended limit.

Now that permission has been granted, we'll need to find ways of working with the school to limit disruption to our amenities.

Kind regards

Thursday, 31 January 2019

Golden Lane Campus - Flood Lighting update

The long running story of the flood lighting for the Golden Lane Campus has taken another step, the planning application will be heard on the 11th of February at the Islington Town Hall:

Click to read the whole letter
The text of the email containing the letter said:
___

You have received this email from Islington Council (Planning Service) in relation to a planning matter at Prior Weston Primary School Golden Lane Campus, 101 Whitecross Street, LONDON, EC1Y 8JA.

The attached correspondence contains important information; please retain it for your records.

If you would like to respond, please reply to planning@islington.gov.uk

In any correspondence, please quote the Council reference number, which is included in the attached letter.

Sunday, 14 October 2018

Proposed Flood Lighting at Prior Weston School

From the chair of the house group:

(apologies for the late posting of this to the blog.  Please do contact Fred if you would like to join this petition)

___

PROPOSED FLOODLIGHTING AT PRIOR WESTON SCHOOL
The residents of Ben Jonson House, Breton House and Cooper House in Whitecross are invited to support the petition below.

To support it either send your name and address to Fred Rodgers, 100 Breton House EC2Y 8PQ or email them to fredrodgers@me.com before 8 October please.
To

The Members of Planning sub Committee A London Borough of Islington
Town Hall
Upper Street
N1 2UD

Re: P2016/1803/FUL: Installation of floodlighting at Prior Weston School, Golden Lane Campus, 101 Whitecross Street, EC1Y 8JA (the Application)

We the below named who would all be affected by the approval of the Application, request that, if the same is to be approved, additional conditions are imposed to ensure that:
  • Effective acoustic screening, as proposed in the planning application P approved on 28 January 2006 but waived by Building Control 05 April 2006, is installed around the MUGA to half a metre higher than the proposed floodlighting, as soon as practically possible and before installation of the floodlighting;
  • The use of the floodlighting after 6.00 pm be restricted to term time and to one day per week, with no such use on Fridays; and
  • Only Golden Lane Campus pupils be permitted to use the MUGA at any time.
We trust that you will both note and take proper account of our request when considering the Application.

8 October 2018
Name Address

Thursday, 9 August 2018

Dropped curb in front of Prior Weston School

From the chair of the Breton House Group:
___

Rineys are creating a 16.5 metre long dropped curb in front of PWS. It will run from just north of the car park entrance.

Other than being paid for by Taylor Wimpey, I have no other information and the Riney employee didn't have any either, not even a drawing! However, it will be noisy and dusty work to add to that across the road.

Monday, 24 October 2016

School Floodlights Circular

A resident has posted a two page circular to the flats which could be directly affected by the proposed Prior Weston floodlights.

The circular ends by pointing out that the deadline for objections is the 27th October (this Thursday), so if you want to comment on the application be quick (follow the link above to see how to comment).

Click to read the whole circular

Sunday, 16 October 2016

School Floodlight Objections

If you feel you may be affected by the addition of floodlights on the Prior Weston school play area (see location here) the deadline for letting Islington council know is 27th October.

For a list of valid reasons to object to planning applications see here.

To submit an objection to this application visit the Islington Planning Portal. Click here for details of how to do this.

The Barbican Association, Ben Jonson House Group and Breton House Group will be raising objections, but it is important that individuals submit their own objections.  If there are only a few objections Islington officers may approve the application using delegated powers rather than allowing the application to go before the planning committee.

Clearly is this important to people, which explains why colour notices have popped up in the lifts.  If you do wish to post a notice then please link to this blog (and this article) as there is much more more information here.

Please remember to add a link to the blog
... and if you have a colour printer and wish to look after the notice boards please do let me know.  Your help with that would be most welcome.

Thursday, 6 October 2016

School floodlighting planning application is in

The Prior Weston school has submitted a planning application for their proposed floodlights. The application is now validated and visible on the Islington planning portal (search for P2016/1803/FUL).

The school clearly decided they didn't want to discuss this further with residents nor run a test installation to give residents an idea of how what they had in mind would look in practice before submitting the application.

Copies of the documents which form part of the application are here.

According to the planning application details on the Islington site (copy here), comments may be made until 27th October.  You may wish to review the valid reasons for objections, but the main considerations here are likely to be light pollution and the possibility of noise later in a floodlit evening.  The school tell us that the reason for the lighting is to allow the use of outdoor spaces in the winter, with no extension in usage beyond the times we experience in the summer.  Planning conditions need to be in place to ensure this, so do write in if this will affect you.

It looks like comments must be submitted via the Islington planning portal:

Click to visit the portal. Search for P2016/1803/FUL


Here is a snip of the light spillage document in the application (copy here):

Click to zoom in.  Use links above to view original documents.



Saturday, 1 October 2016

Banging the drums - noise from the school


A number of residents in Ben Jonson House and in Breton House are being disturbed by what seems to be a new outdoor music play and teaching area at the Prior Weston school on the Golden Lane Campus.  This has been discussed on Barbican Talk.

Here are the words of one resident.
Persistent Percussion Problems from Prior Weston 
The noises emanating from Prior Weston School over the last few weeks might have led BJH residents to conclude that the new 'Centre for Music' was already up and running. 
In fact, the recurrent (some would say constant!) percussion sounds are not attributable to the LSO but to very young children who are being given access to drums, chimes, bells, tambourines, and cymbals in the out-of-doors covered play area at street level.   
Unsurprisingly, the instruments have been beaten with considerable gusto between 9 am and mid afternoon ever since the first day of the new school year on 8 September. 
For at least some residents in earshot who are at home during the day, the loud noises have been distracting, distressing and even maddening, judging from comments on Barbican Talk. The crashing cymbals are especially nerve-shattering, but the rhythmic drum beats and jangling bells are equally hard to ignore. 
Contact was made with the School by a couple of residents early on, but to no avail. Islington Council was also alerted, and the result was a 'noise diary' kept over two weeks at the request of the Council which (along with some recordings) provided evidence of how frequent and disruptive the percussion sounds can be.  
A meeting between the School, BJH and Breton reps, the chair of the Barbican Association, and affected residents will take place on Tuesday 4 October, and the need to keep musical instruments indoors and out of the hearing range of local residents will be emphasised.
The 4th October meeting mentioned above will be held at the school and will be attended by representatives of the school, representatives of the house groups and a number of directly affected residents.  There is one remaining slot for a resident affected by this noise in Ben Jonson House.  Let me know (ben.jonson.hg at gmail.com) if you would like to attend.