BEO Rubbish reminder


From the BEO:

___

We've noticed more black bin bags being left in communal areas, particularly at weekends and outside collection times. Following the brief guide below will help keep communal areas welcoming for residents and visitors, while preventing unpleasant smells, spillages on concrete or carpets, and pests.

Our weekly rubbish collection takes place Monday to Friday between 8:15-10:30 am*.
  • Rubbish should be placed in the bottom locker ahead of collection time (8:15am onwards). If you’re unable to use your locker for any reason, please only put the rubbish out in the morning ready for collection.
  • Please do not leave rubbish outside your flat, overnight, at the weekend or outside of collection times.
  • Please remember to tie your bin bags when disposing of rubbish.
  • We also ask that you take the time to break down any cardboard boxes that don’t fit in the rubbish locker or recycling bags and leave them neatly by the rubbish locker.
  • If you use food waste bags, please use the food caddy to help prevent spillages which can permanently affect concrete and tiles (caddies and food bags can be requested at the Estate Office Reception).
*The Towers have additional weekend collections:
  • Cromwell Tower - Saturday collection
  • Lauderdale Tower - Sunday collection
  • Shakespeare Tower - Saturday & Sunday Collection from 02 level.
More information can be found on the Barbican Estate website.

We thank you in advance for your assistance with these matters, as it greatly aids the Block Cleaners to carry out their duties effectively.


Thursday, 22 October 2026

Barbican Library Refurbishment

 

The plan for the library ...

___


In my last email, I let you know that the refurbishment works at Barbican Library were due to start at the end of October. I can now confirm that the actual start date for these works will be Monday 2nd November 2026. This is to avoid the half-term holidays. The impact on the service will be as follows:

Children's Services

  • From Monday 2nd to Saturday 7th November, there will be no children's stock available for loan at Barbican Library.

  • Regular children's activities, such as Rhyme Time and Story Time, will still be taking place as usual, in an alternative location. Additional information about this will be sent to the email addresses registered on library accounts of children who are aged under 5 and through our Children's Newsletter service.

  • From Monday 9th November, for the duration of the works to the children's library, there will be a limited collection of children's books available for loan from the Bostock Community Meeting Room at the front of the library.


Music Services

  • From Monday 2nd to Saturday 7th November, there will be no music stock available from Barbican Library.

  • From Monday 9th November, there will be a limited collection of music-related books (no scores or CDs) available in the main library. CDs are still available at Shoe Lane Library and Artizan Street Library and Community Centre. You can reserve these items for free to be collected at Barbican Library.

  • At least one piano will be relocated to the main library, with booking and headphones available from the main library desk.


The Children's and Music libraries are expected to reopen at the beginning of January 2027.

I would like to remind you that we have now extended the number of items you can borrow as per below:

Item Current Temporary Extension
Books 12 20
CDs 12 16

Also, any items from the Barbican Children's and Music libraries will have their due dates automatically extended to 15th January 2027.

If you have an item with this date that is reserved by another user, we would be grateful if you could return it earlier for the person who is waiting for it. You will receive a Recall email if this is the case.

Thank you so much to all those who have filled out the survey to give us more details on the potential impact of the refurbishment works. Here is a summary of the main concerns and our response:

Concern Response
More limited physical stock collections During the refurbishment, unfortunately we will have to restrict the amount of stock available from different areas of the library at different times. We will do our best to provide a well curated selection of our most popular stock for each area affected. A full range of stock is available at Shoe Lane Library and Artizan Street Library and Community Centre, and you will be able to reserve items from these libraries for collection at Barbican Library for free. The extensive closed store of unique, significant and out of print books (adult only) held at Barbican Library will still be available for reservation for collection too.
Limited study/work space We are currently working with the Barbican Centre team to identify areas in the rest of the Centre where more tables and chairs can be provided for the duration of the refurbishment. There is also study/work space available at Shoe Lane and Guildhall libraries.
Events and groups We will relocate all our events and groups to other spaces in the Barbican Centre. Please look out for email updates regarding this if your regular event/group has an email list or see posters in the library.
Missing social connection/quiet space for mental wellbeing We appreciate that for many people, the library is an important part of their routine and a way to stay connected to others or take a quiet break. We will do our best to ensure there is still comfortable seating for those who need it, groups will still take place, and our staff will still be there to welcome people and assist.
Limited access to newspapers and magazines Newspapers and the most popular magazines will still be available throughout the project. A much larger range of magazines is available through our digital service.
Limited access to library computers During the second phase of works from January, when the main library will be refurbished, unfortunately there will be limited access to computers in the library, with only 3 available in the Music Library. Shoe Lane and Guildhall libraries do have sufficient numbers of computers available for public use.

And finally, thank you to all those who came to the information sessions or who sent me their queries and their lovely comments about the library and the team via email. We know how important Barbican Library is to all of its users and how cherished it is, and we really appreciate your support and patience during this time of disruption to the service.
Best wishes,

Rachel
Rachel Levy
Head of Barbican & Community Libraries - City of London Corporation

Friday, 2 October 2026

1st Oct. Heating is on! But how does it work ...

 From the BEO:
___

What we’re hearing…

With the beginning of October, the Estate wide underfloor heating system has now been switched on, and it will stay on until 30 April. In other words, a natural topic to address this week. 


Please keep in mind, when the Barbican Estate was designed and built over 60 years ago, it included the provision of background heating for all homes. This principle goes a long way to explaining the cause of many queries and complaints we receive. Here are some of the most frequent questions we find ourselves answering. 


What can I expect of the system?


  • It was, and continues to be, intended as a background heating system, a starting point that enables adjustments to be made to meet resident’s personal preferences.

  • People’s preferences regarding comfort are infinitely varied – indeed even sometimes within one household. The system provides to all a “background” level of heating which can then be adjusted home by home by our resident engineers, through heating levels being turned up/down, or areas being turned off altogether.

  • Various factors can affect how each flat on the estate gains and retains heat; aspect of the windows, size of the flat, and layout of the flat, are all key factors to consider. These differences can significantly alter what residents can expect from the background heating system. In most cases, it should not be expected that this system will provide full heating of a flat, particularly during the colder months of the year, and supplementary heating will need to be provided.


How does it work?

The system works with a fairly complicated set of timings and parameters; the system will only come on when external temperatures drop below a set temperature, which changes depending on the time of day. The timings below show the times in which the heating may come on, with the corresponding temperatures showing what external temperatures must fall below in order to activate.


2:30 – 7:30am: 15 Degrees Celsius

1-4pm: 10 Degrees Celsius

8:30pm – 1:30am: 7 Degrees Celsius


The amount of time the heating is then on for, depends on how far temperatures fall below the set trigger point. For example, during the 1-4pm period, if external temperatures are around 8 degrees, the heating may only be on for around 30 minutes during that period, whereas if external temperatures are around 0 degrees, the heating may be on for the full duration. Please note that these are indicative figures to explain how the system works and is not a guaranteed level of heating.


This will mean that, during milder weather, there will be days where no heating is provided at all by the system.


As an individual household, what can I do to adjust the temperature to my preference?

Each flat has a master control mechanism (trimmer) that allows the Barbican Engineers to adjust the heating levels in the flat. The following options are available:

  1. The underfloor heating pads in each room can be set to either the “on or off” position. Some residents for example choose to switch off the heating in their bedrooms.

  2. The overall temperature setting for the flat can be adjusted from low through medium to high, but please note that the chosen setting will apply to the heating in every room where the under floor pads are switched “on” and it is not possible to vary the temperature setting between different rooms.


If residents are still too cold once heating has been set to high, supplementary heating is the responsibility of the resident to provide. Requests for the system to be adjusted should be made via the app, or, by calling the Repairs Desk on 020 7029 3909.


If the system in my flat is not working, who should I contact?

Should there appear to be any failure in the system, this should be reported at once to the Repairs Service Desk 020 7029 3909 during office hours only (8:30am-5pm, Monday – Friday), or via the App. Outside of office hours, contact your Car Park Attendant or Lobby Porter who will contact the Duty Manager for you.


Where can I find more information?

Further information and explanation on how the system works can be found on the City of London website via Barbican Estate repairs and maintenance - City of London or in the Background Under Floor Heating Guide, available here.    

Thursday, 1 October 2026

Repairs Call Centre - It's the only way

The BEO is introducing a new dedicated call centre.  They prefer that we use the Barbican Estate app to raise new issues, but there is a phone number too: +44 207 029 3909.

The flyer includes the following note:

One way in, for everything. If something's broken, leaking, or not working, this is where it needs to be reported, whatever the issue and however it ends up being fixed. To make sure everything is properly logged, informal reporting routes are closing. Mentioning something to a porter, concierge, or contractor on site is no longer enough for it to be actioned, it needs to come through the App or the phone line so it gets a reference number. Out of hours emergency arrangements through your Concierge are not changing.
Here is the flyer:

Click to read the flyer

Saturday, 26 September 2026

Too hot, too cold?

 From the BEO:
___

Announcement title:Overheating and planning update

Dear Residents,

I hope everyone is well.

We recognise that the recently published revision of the National Planning Policy Framework following a campaign by the Duke of Westminster to modernise historic buildings. Policy CC3 (at page 30) now requires that "Substantial weight should be given to the benefits of improving the resilience of existing buildings and public spaces to anticipated climate change impacts.", which relaxes planning guidance when adapting listed buildings for climate change an important development for residents.

We also understand that long-term planning is critical, particularly when considering how our buildings can respond to increasingly frequent periods of hot weather. However, we also need to make sure that we can identify and deliver practical measures that can support residents in the shorter term. We are already working on this.

Our heating and overheating study by AMBUE is due to conclude later this year and will help us better understand the risks and identify appropriate measures for our diverse buildings. Alongside this work, we are already developing options and proposals for next summer, so that we can consider timely, project-based interventions to support residents during periods of hot weather.

Following the recent planning announcement, we have also specifically asked our consultants to consider the new guidance and its implications as part of their study. We want to ensure that it is properly reflected in their assessment recommendations, including any opportunities it may provide for future interventions.

This means we are taking a two-track approach:

  • Long term: using the study and wider building planning work to establish a robust approach to overheating and climate resilience.
  • Short term: developing practical measures and proposals that could be implemented ahead of, or during, next summer where appropriate.

We appreciate that residents need both a clear long-term plan and confidence that action is being taken now. We are therefore not waiting for the longer-term strategy to be completed before considering what can be done in the immediate future.

Once the study is complete and we have considered the consultants' findings alongside the updated planning guidance, we will be able to provide a clearer picture of the measures being considered and the next steps for residents.

I am conscious that I am writing about overheating just as it getting colder and the heating is about to come on! So, please be assured that that work is also being done to address this.

Tuesday, 1 September 2026

In-House Repairs - Reporting a Repair

 From the BEO:

---

Dear Residents,

With the in-house repairs service going live today (1st September), please be aware of the small change to how repairs can be reported.

Non-Emergency Repairs Should be reported via the Barbican Estate App at any time, OR by telephone on 020 7029 390 during the hours of 08:30-17:00 Monday-Friday.

Emergency Repairs Should be reported by telephone on 020 7029 390 during the hours of 08:30-17:00 Monday-Friday. If out of hours, you must contact your Porter or Car Park Attendant, who will notify the Duty Manager.

Please note, repairs requests will no longer be accepted by email, and must go through the channels as outlined above. More information on the new service can be found in the attached document.

Kind regards, Property Services Barbican Estate Office

Sunday, 1 March 2026

90 Week Highwalk Resurfacing Project - More plans

 The City recently published two documents regarding the proposed 90 week project to strip back the eastern highwalk and relay it.  This is "phase 2" of the resurfacing work.  You can see the rather disappointing results of phase 1 as you walk towards the Barbican tube station, noting the blocked drains, cracked tiles and blocked direct route to the bridge (while they try to fix up something they missed in phase 1, no doubt).

The two documents are:

The wider issue of fixing the drains across the estate gets scant mention.  Rather, the focus is on the superficial works which, if you see the images in the document, will make the highwalk look lovely.  I recall similar documents for phase 1, and look at what we got.

To be fair I will note that the City does claim that they will apply a waterproof membrane beneath the new surfaces.  The problem is that a waterproof membrane without working drainage give you ponds, just as we see with the phase 1 work.

Anyway, I have written a letter to our councilors:

Dear [Councillors],

I note that the City is proceeding with Phase 2 of the podium works.

My concern is not that drainage works are absent, they are referenced in the documentation, but that they are:
1. Embedded within a much larger strip-back and landscaping project, and
2. Limited to the specific Phase 2 footprint rather than forming part of a coherent, estate-wide drainage strategy.

Drainage performance appears to be the fundamental issue affecting the highwalks (and indeed the structure of the Barbican!). Persistent ponding, blocked gullies and tile deterioration, including on the recently relaid western end, suggest systemic drainage shortcomings rather than isolated surface failures.

Blending drainage remediation into a predominantly surface-led scheme risks obscuring whether the underlying infrastructure is genuinely being resolved.

Before committing to 99 weeks of disruption, it would seem logical to:
- Publish a clear estate-wide drainage assessment,
- Confirm whether the wider podium drainage network has been surveyed in full,
- Explain why drainage is not being addressed comprehensively across the estate before further surface strip-back works proceed.

Without that clarity, this risks becoming a repeating cycle of surface renewal without structural resolution.

I would be grateful if you could seek a clear explanation from officers on how Phase 2 fits within a broader infrastructure strategy for the Barbican podium, in particular with respect to drainage.

Saturday, 7 December 2024

Don't flush those wet wipes!

From the BEO:

---

Please consider what you flush
 

Unfortunately this week has seen another pipe blockage occur on the estate. As you can imagine these incidents are very unpleasant and stressful for both the residents affected and the staff who work to rectify the issue.

Please consider what you are flushing down your toilets, wipes are one of the biggest causes of blockages in pipes, and go on to cause flooding on the estate.

Wipes are often labelled as ‘flushable’, but regardless of any claims on packaging, wipes should never be flushed down the toilet as they are not compatible with our plumbing system. We kindly request that you, your guests, subtenants, or private cleaners refrain from flushing them down the toilet.

Our plumbing system, equipped with cast iron pipes, is particularly susceptible to snagging on anything other than toilet paper due to naturally occurring material imperfections which can easily lead to blockages and subsequent issues. The consequences of these blockages extend beyond inconvenience, causing significant distress to our lower floor neighbours and necessitating extensive and costly clean-up efforts by our contractors and staff.

To prevent the risk of future incidents, we urge all residents to ensure wipes are disposed of in bins rather than flushing them down the toilet. This simple action will greatly contribute to maintaining a pleasant living environment and drive down avoidable sewerage repair recharge costs for all residents. Thank you for your cooperation and understanding.

Monday, 18 March 2024

Highwalk still leaks

Further confirmation that the City's mega projects to strip back and relay the surface of the highwalks was a poor choice.

Rather than establish a boring on-going maintenance programme to fix the drains and carry out essential repairs the City awarded themselves a capital project to completely resurface the western end of northern Barbican highwalks.  The project took ages, inconvenienced residents for years and cost a fortune.  In the end the highwalk looks little better than it did before (some say worse) and the water penetration problems, the excuse for the project in the first place, remain.

The City are currently trying to justify a re-run of this disaster at the eastern end of the northern part of the Barbican highwalks, Ben Jonson Highwalk and its neighbours.

The number one priority in this context should be to fix the drains as part of a long term on-going maintenance programme ... but no.

And then the City acts all surprised when water penetration is *still* causing problems on the western highwalk illustrating that the resurfacing project was, in many ways, worse than useless.

As reported in the latest Barbican Estate Bulletin:

---

Podium repair work - Beech Gardens


Property Services have been carrying out work to resolve a leak into the reception area of Nuffield Health. An area of podium tiling had been lifted and waterproofing work carried out to cure the leak.

Tuesday, 22 November 2022

Barbican Estate Office : What Matters To You

From the City:
___

Dear Residents,

As you will be aware following the recent communication from Paul Murtagh in the News Bulletin and posted on notice boards, Altair has been appointed to undertake an independent review of the services provided to you through the Barbican Estate.

A key aspect of the review is to gain insight into your views. We will be doing this in several ways including holding drop-in sessions and an online survey, so everyone has the opportunity to feed into the review.

If you are not able to make any of the dates below, Altair are also seeking your views through this short survey.

The closing date for this survey is Sunday 4 December.

On Tuesday 29th November , Julie Leo and Darren Smith, Altair consultants will be at the Barbican Estate to run a series of drop-in sessions, where residents will be able to visit and share their views with us. We have extended the final session to 7.30pm to ensure as many residents as possible have the opportunity to share their views.

Anyone can visit to share their views.
  • 10.00am - 11.30am
  • 1.30pm - 2.30pm
  • 4.00pm – 7.30pm
All drop-in sessions will all take place in the Lilac Room at Barbican Estate Office.


Sunday, 13 March 2022

Rubbish Locker Doors

Here is a note from the BEO about rubbish locker doors.  See here for a picture of what they are talking about.

The note from the BEO:
___

Rubbish Locker Doors

Following a recent inspection by the City of London’s Fire Safety Officer, we have had to remind all our cleaning staff, to ensure all the lockers by the front doors are left locked when shut, after rubbish collection has taken place.

We understand that this may be an inconvenience to some of you but as the lockers form part of the fire safety compartmentation, it is essential they are left shut at all times.

We are aware that there are a number of broken locker doors or locks across the estate, and these are being dealt with. The cleaners have also been reminded to report any faulty doors or locks in the future.

Over time, some of you may have lost the keys, or not had them passed on to you by the previous owners. If this is the case you can borrow one from the Porter/Concierge but you can also purchase one from the local hardware shop such as City Hardware on Goswell road, and ask for the Barbican square rubbish locker key.

Please be reminded that the lockers are there for this purpose and with regular rubbish collections across the Estate, there should be no need to leave anything out in the communal areas.

Thank you for your assistance and understanding with this matter.

Sunday, 12 December 2021

Those duplicate service charge invoices

If you have received service charge invoices which make no sense the BEO would like to explain why this happened:
___

Duplicate Invoices - Apologies and

Explanation

Some residents may also have received duplicate copy invoices covering the period dated 28 May 2021 through to 29 September 2021. Our invoices are now fully automated and are despatched by an external printing company which would explain why you may have received copies on different days. The financial information contained in these copies are correct.

Measures have been put in place to prevent this from happening again, this is regrettable. Please accept our apologies for the inconvenience caused.

A refund, if needed can be processed or alternatively carried forward to the December 2021 quarter which will be produced next week.

Please direct any enquiries to Chbincome@cityoflondon.gov.uk

Monday, 6 December 2021

4th Utility, gesture of goodwill

From 4th Utility:
___





Dear 4th Utility Customer,

We would like to apologise to our customers and thank them for their patience during the internet and VoIP outage experienced at the Barbican Estate.

Our immediate focus was concentrated on replacing centralised equipment and routers in customer homes, working around the clock to get them back online as quickly as possible. We're very pleased to say this work is now complete, aside from customers who are away.

We're sorry and want to offer a good will gesture

As a gesture of good will for the inconvenience this has caused, we are going to credit your account 70% of your monthly rental which will appear as a credit in the next 5-10 working days and will see a reduced payment in your December or January invoice.

Given that we had the new central kit providing service to the estate and a significant proportion of customers back online all within 2 working days of the outage, with CPE available on site for all other customers to take up, we believe the above offer is reasonable and exceeds a simple pro-rata refund of your monthly subscription.

In addition, we will be providing a donation to 'The Barbican Centre Trust' of £2000, on behalf of the Barbican residents.

What happened?

After our acquisition of VFM earlier this year, upgrading the infrastructure at the Barbican Estate was always part of our longer-term improvement programme. Our intention was to bring the equipment into line with our own standard build, which offers improved remote diagnostics, speed of upgrades, and advanced support capabilities, ultimately enabling us to provide a better service for customers.

During a recent scheduled maintenance window at the Barbican Estate, an unexpected hardware failure occurred. The 4th Utility team reacted quickly and had new centralised kit and 1,000 routers onsite within 4 hours of the outage. Staff were also deployed to site quickly to answer customer questions, distribute equipment, and assist with installations.

Could this occur again?

This hardware failure means that the migration on to new equipment in line with our improvement programme has been accelerated for the Barbican Estate. The expedited migration also led to a discovery of further possible site and service enhancements that will now be built into our ongoing development plans.

Now that the new infrastructure is in place, we will be able to offer our customers a better, fully supported service and because the build is more modular, future risks are minimised. As a result of this work, we are confident that any future issues will only have a marginal impact and will be straightforward to manage and resolve quickly. Because of the steps we have taken over the last few days, we do not anticipate the same level of disruption happening again.

If you have any questions or would like any further technical information, please contact us via support@4thu.co.uk and one of our technical or executive team will be happy to respond, over the phone or via email. We know how vital broadband connectivity is for all of our customers, and that's why it's important to us that the quality of our products and services is always high. Thank you again for your patience and for sticking with us.



Copyright © 2021 The 4th Utility | All Rights Reserved

Saturday, 20 November 2021

Big trouble with 4thUtility - or how we lost the Internet for a few days

  In August this year 4th Utility took over from VFM as the guardians of the fibre network on the estate.

Last week, from midnight to 04:00 on Tuesday 16th November, 4th Utility undertook some maintenance work.  The time window was planned well in advance, but the maintenance did not go at all as planned; everyone on the estate who uses the 4th Estate fibre service lost their connection to the Internet for a number of days.

What was expected to be a significant but straightforward maintenance task turned into the complete replacement of server room equipment which in turn required the replacement of every router on the estate.  To their credit, 4th Estate quickly realised the magnitude of the issue and asked their Manchester based staff to get on a train to London right away, and to take along replacement server gear and hundreds of new routers.

It turns out that we really do depend on the Internet these days.  Some were unable to watch the film they wanted to see, some were unable to work, some even lost valuable work.  People certainly wanted to get back online as quickly as possible, hundreds of residents queued to get their new router at noon on Wednesday:

At the head of the queue was a desk where 4th Estate staff (Brand Ambassadors!) were handing out new routers and noting which flat got which device.

Over the next day most new routers were connected.  Mostly residents were able to unplug the old and connect the new by themselves, for some a house call from the 4th Estate staff was needed to get things going.  4th Estate staff manned their desk on the highwalk from Wednesday to the following Sunday

The cause of the problem was something like this:  The equipment inherited by 4th Estate has been serving residents for some time and was very much in need of an upgrade.  The maintenance planned for the 16th of November was to keep the current equipment going a little longer while the larger upgrade was rolled out.  The manufacturer of the current equipment felt that the plan, yanking out and replacing some of the equipment, was safe because the service should just fall back to secondary systems ... but what happened instead was the a total failure.

Given the total failure the easiest thing to do would be to install like-for-like replacements of the broken systems, but the nearest were in Dubai!  So, 4th Estate decided to bring forward the larger upgrade and replace the broken kit with brand new server room systems and replace every connected router too.  Quite a task.

Now that the Internet service is restored for most, if not all, 4th Estate customers I'm sure "lessons have been learned" (again).  The biggest for me is to have a fallback plan for our Internet connection (e.g. a mobile hotspot and a data SIM) and of course to make sure all our valuable data is backed up.

Sunday, 14 November 2021

Water tank work - from 29th Nov

From the BEO:
___

Cold Water Storage Tank Works - Ben Jonson House

Smart Managed Solutions working with City of London Corporation will be carrying out urgent works on the cold-water storage tanks over a two-day period, between Monday 29 November - Tuesday 14 December.

Residents affected will be sent a letter with precise dates and times of the disruption.

On day 1 there will be disruptions to properties between 10am - 4pm.

During this time, we will require you to NOT use any of the bathroom and bathroom fed services, this includes washing machines or dish washers ‘fed’ from the bathroom facilities.

On the second day engineers will carry out non-disruptive remedial completion works from 10am to 4pm.

Residents may wish to store a bath full of water for flushing the toilet on the day of disruptions. This will include opening/turning on of any bathroom taps between 10am until 4pm and the flushing of toilets from 10am – 4pm. Due to the nature of the work involved this may overrun, but you will be informed by our operatives.

Mains drinking water will not be affected.

Every effort will be made to keep noise levels to a minimum during the hours of 10am – 4pm

SMART operatives will visit a number of properties once the work is complete to ensure services have resumed as normal.

Following recent Government advise relating to COVID-19 all engineers will be wearing the correct and necessary PPE. Communal areas that workmen have to access with be sanitised before and after use.

If you require any further information please contact the Project Manager, Steve Hope on 07577 967907, Smarts main office on 01268 206188 or the City Project Manager.

Thursday, 19 August 2021

Farewell Vision Fibre Media (VFM)

Here is the farewell email from the Vision Fibre Media (VFM) people:

___

Good afternoon Barbican Estate residents,

We wanted to get in touch to let you know that we are handing over all communications regarding your broadband, TV infrastructure and telephone services to 4th Utility today.

4th Utility now have full control of the network and will cover all support queries with their 24-7-365 UK based Customer Care team.

From today we will be closing the support@visionfibremedia.com inbox as all support emails will be dealt with via 4thUtility. Any outstanding tickets logged prior to today are already on the system and will be addressed. Please save support@4thu.co.uk on your email safe list.

What do I do next?

4th Utility have been sending out emails in batches to VFM customers from the email address barbican@4thu.co.uk with a URL / link unique to you showing your account details on their website www.4thutility.co.uk.

Customers need to be migrated from the VFM legacy billing platform on to 4th Utility billing platform, and it needs to be done manually due to GDPR. Once customers click on the link they have been sent in the email, they can check their package is correct and input their payment details.

Billing will not commence until your September invoice so please do not cancel any existing payments as this will be done for you after the last payment in August automatically.

If you have any further questions, not received your link or would like any more information, please do not hesitate to get in touch using the information below.

24/7/365 dedicated support team:
Tel: 0800 102 6223

Email: support@4thu.co.uk
barbican@4thu.co.uk

Kind Regards