Tuesday, 24 January 2023

Phase 2 Poduim Works

The Weekly Planning List from Sue Cox included details of the proposals for "Podium Phase 2". Podium Phase 1 tackled Beech Gardens and the north western part of the estate. Phase 2 will tackle Ben Jonson Highwalk and the north eastern part.

The reference number for the application is 22/01178/FULL and 22/01179/LBC. Search for those names here (the City web sited does not support direct links to applications for some reason):

https://www.planning2.cityoflondon.gov.uk/online-applications/

Here is my comment:

The proposal is a pretty shocking misallocation of funds, especially at a time of economic stress.

The photographs of stained and damaged tiles included in the phase 2 design and access statement could just as easily have been taken in and around Beech Gardens (the results of Phase 1) which has plenty of blocked drains and damaged tiles. Even the bucket shot could have been taken in offices below Beech Gardens long after Phase 1 was declared complete.

In retrospect, Phase 1 was a really bad idea mainly because the critical underlying issue was not addressed (the drains were not fixed first) but also because the end result is no better than the current state of the area slated for phase 2. Fixing the drains plus a well funded maintenance programme would have produced a much better outcome than the phase 1 project, and would have been far less stressful all around.

So rather than use the allocated funds on phase 2 as proposed, allocate tranches of the money to:
  • >>> Fix the drains <<< (I know work for this is proposed in phase 2, but this should not just be a one-off "project" to fix the drains, rather it should be part of maintenance)
  • Establish a rolling maintenance programme for the drains including a long term vision of how site drainage will evolve.
  • Re-visit and repair the Phase 1 work at Beech Gardens. The drains should be fixed, of course, and damaged and stained tiles should be replaced as needed.
  • Start a programme of rolling maintenance for the highwalks as a whole using best practice materials (e.g. for now, the tiles used on for Phase 1 Beech Gardens can be used to replace damaged tiles elsewhere).
  • Remove Yellow Shed. Often promised and dangled as a carrot: "if you residents would only approve our latest plan X we promise to finally remove the shed!" ... only to recant and leave the shed in place (... a handy carrot for the future).
  • Restore the automated drip water system. Should be fine with fixed drains. More efficient for staff & save water too.







Tuesday, 20 December 2022

Beware Slippery Surfaces!

From the BEO
___

Dear Residents,

Due to the considerable change in temperatures, there is a lot of condensation that has formed on the walls, ceilings, glass and floors. This is making the floors & staircases very slippery. We have asked our cleaning staff to concentrate on mopping the floors as best they can.

Unfortunately, we don't have enough hazard signs to put up in every entrance. So, we are advising caution when moving around the Estate. Please note the podium and car parks are also slippery in places that don't usually get wet.

Kind regards

Barbican Estate Office

Sunday, 18 December 2022

House Group AGM: 11th Jan in the Lilac Room

 As announced in the December house group newsletter, the Ben Jonson House Group AGM is scheduled for 11th January in the Lilac Room (which is here) at at 19:00:

Click to read the whole newsletter









Filming action scheduled for 17th Feb

 It seems filming for a "high end" TV show will be happening in the Barbican on 17th Feb, with set-up running from 13th - 16th and tear down happening 18th-19th:

Click to read the whole letter


1st Dec Heating Webinar docs

 In the 2022-12-16 newsletter the BEO gave a link to the notes and slides shown at the 2022-12-01 webinar about the underfloor heating:

Click to read the whole document


Wednesday, 23 November 2022

BJHG AGM - 2023-01-11 19:00 Lilac Room

The house group committee have given notice:

---

Please note the AGM will take place on Wednesday 11th January 2023 at 7pm in the Lilac Room.

Tuesday, 22 November 2022

Barbican Estate Office : What Matters To You

From the City:
___

Dear Residents,

As you will be aware following the recent communication from Paul Murtagh in the News Bulletin and posted on notice boards, Altair has been appointed to undertake an independent review of the services provided to you through the Barbican Estate.

A key aspect of the review is to gain insight into your views. We will be doing this in several ways including holding drop-in sessions and an online survey, so everyone has the opportunity to feed into the review.

If you are not able to make any of the dates below, Altair are also seeking your views through this short survey.

The closing date for this survey is Sunday 4 December.

On Tuesday 29th November , Julie Leo and Darren Smith, Altair consultants will be at the Barbican Estate to run a series of drop-in sessions, where residents will be able to visit and share their views with us. We have extended the final session to 7.30pm to ensure as many residents as possible have the opportunity to share their views.

Anyone can visit to share their views.
  • 10.00am - 11.30am
  • 1.30pm - 2.30pm
  • 4.00pm – 7.30pm
All drop-in sessions will all take place in the Lilac Room at Barbican Estate Office.