Noisy Work Hours amended


From the BEO:
___

Noisy Work Hours amended

Barbican Contractors: 9am – 5pm

(Works carried out by our contractors (Metwin etc). They will try to not start before 10am but certain works need a full day to complete and may have to start from 9am). Emergency Works may have to take place outside of these hours.

Residents Private Contractors: 10am-4pm

Alterations in Leaseholders flats. (Please note there is no quiet period) if there are complaints of noisy work starting before 10am or after 4pm please contact the House Officer for your block.


City: 8am – 6pm eg road works, gas, electric water repairs & work not controlled by the Barbican Estate Office.

(Quiet times of 10-12 and 2-4 stipulated)

Tuesday, 24 January 2023

Phase 2 Poduim Works

The Weekly Planning List from Sue Cox included details of the proposals for "Podium Phase 2". Podium Phase 1 tackled Beech Gardens and the north western part of the estate. Phase 2 will tackle Ben Jonson Highwalk and the north eastern part.

The reference number for the application is 22/01178/FULL and 22/01179/LBC. Search for those names here (the City web sited does not support direct links to applications for some reason):

https://www.planning2.cityoflondon.gov.uk/online-applications/

Here is my comment:

The proposal is a pretty shocking misallocation of funds, especially at a time of economic stress.

The photographs of stained and damaged tiles included in the phase 2 design and access statement could just as easily have been taken in and around Beech Gardens (the results of Phase 1) which has plenty of blocked drains and damaged tiles. Even the bucket shot could have been taken in offices below Beech Gardens long after Phase 1 was declared complete.

In retrospect, Phase 1 was a really bad idea mainly because the critical underlying issue was not addressed (the drains were not fixed first) but also because the end result is no better than the current state of the area slated for phase 2. Fixing the drains plus a well funded maintenance programme would have produced a much better outcome than the phase 1 project, and would have been far less stressful all around.

So rather than use the allocated funds on phase 2 as proposed, allocate tranches of the money to:
  • >>> Fix the drains <<< (I know work for this is proposed in phase 2, but this should not just be a one-off "project" to fix the drains, rather it should be part of maintenance)
  • Establish a rolling maintenance programme for the drains including a long term vision of how site drainage will evolve.
  • Re-visit and repair the Phase 1 work at Beech Gardens. The drains should be fixed, of course, and damaged and stained tiles should be replaced as needed.
  • Start a programme of rolling maintenance for the highwalks as a whole using best practice materials (e.g. for now, the tiles used on for Phase 1 Beech Gardens can be used to replace damaged tiles elsewhere).
  • Remove Yellow Shed. Often promised and dangled as a carrot: "if you residents would only approve our latest plan X we promise to finally remove the shed!" ... only to recant and leave the shed in place (... a handy carrot for the future).
  • Restore the automated drip water system. Should be fine with fixed drains. More efficient for staff & save water too.







Tuesday, 20 December 2022

Beware Slippery Surfaces!

From the BEO
___

Dear Residents,

Due to the considerable change in temperatures, there is a lot of condensation that has formed on the walls, ceilings, glass and floors. This is making the floors & staircases very slippery. We have asked our cleaning staff to concentrate on mopping the floors as best they can.

Unfortunately, we don't have enough hazard signs to put up in every entrance. So, we are advising caution when moving around the Estate. Please note the podium and car parks are also slippery in places that don't usually get wet.

Kind regards

Barbican Estate Office

Sunday, 18 December 2022

House Group AGM: 11th Jan in the Lilac Room

 As announced in the December house group newsletter, the Ben Jonson House Group AGM is scheduled for 11th January in the Lilac Room (which is here) at at 19:00:

Click to read the whole newsletter









Filming action scheduled for 17th Feb

 It seems filming for a "high end" TV show will be happening in the Barbican on 17th Feb, with set-up running from 13th - 16th and tear down happening 18th-19th:

Click to read the whole letter


1st Dec Heating Webinar docs

 In the 2022-12-16 newsletter the BEO gave a link to the notes and slides shown at the 2022-12-01 webinar about the underfloor heating:

Click to read the whole document