Thursday, 24 December 2015

City still pushing for new bridges over the lakes

Topic from a thread on Barbican Talk ...

The results of the Barbican Area Strategy Review showed quite clearly that below-podium bridges over the lakes was unpopular, yet the City just won't let the idea go.

The following snippets are from from the September 2015 "Towards A World-Class Centre For Music" document produced by the Arts Centre branch of the City of London.
See page 225

The yellow path to Rattle Hall which some people think will become the primary entrance to the arts centre complex:

The yellow brick road we said we didn't want (pp 236)

The Peeping Alarm Story

The peeping alarm on the substation beneath Breton House has now been fixed.  Here are some notes from the story taken from this thread on Barbican Talk:

The alarm started sounding on Saturday 19th Dec.

The alarm was on the power substation so the first port of call was UK Power on 0800 096 9960 (note: the substation's reference number is 42066). UK Power engineers visited a few times over the weekend and concluded that the problem was with the alarm battery, but in the end concluded that it was not their alarm nor their battery. The alarm is for the halon gas alarm for the substation which is apparently not the responsibility of UK Power Networks.

The estate engineer was contacted next (24/7 help desk on 02073827222). He could not get through the locked gate to reach the alarm, which was unfortunate because there is a simple re-set button that simply needs to be pressed, until such time as the alarm is fixed.

The estate engineer said that the alarm is apparently the responsibility of the barbican centre and they had to wait for the fire alarm company, Global, to come out.

While waiting for Global the CPAs were able to get access to the alarm and used the reset button to silence it from time to time.

No more peeping heard from the evening of 23rd. Presumably Global have fixed it.


Noise Abatement Notices

There is a thread on Barbican Talk about the recent peeping substation alarm issue.  This message explains the Noise Abatement Notice and I thought I'd post it here (edited slightly to add links and make it more generic) for future reference:
____

Contact the City environmental health people by phone (020 7606 3030) or email.

Ask the duty inspector to assess the noise.

He/she will thereby be in a position to declare the noise a 'statutory nuisance' under Section 80 of the (1990) Environmental Protection Act, which will thereby allow CoL to issue and serve an S80 Noise Abatement notice.

CoL will no doubt have the details of who to contact, but require 'proof' (most importantly onsite, first-hand evaluation by their representative) so as to be able to justify/defend the escalation, and any action taken to that end, if necessary in court.

KEY POINTS (including in any follow-up conversation)
  1. For noise to amount to a statutory nuisance, it must be "prejudicial to health or a nuisance" 
  2. An abatement notice can be served by the local authority if they are satisfied that a noise problem amounts to a statutory nuisance. 
  3. The notice may require that the noise be stopped altogether or limited to certain times of day. 
  4. The notice can be served on the person responsible for the noise, who then has 21 days to appeal.

Often/usually 'the threat' of formal sanction is enough.

NEW BEO Website

I just noticed that in recent BEO email messages it says this:

Barbican Estate Office Please do not reply to this email as it is automatically generated and your reply will not reach us. Click here for the NEW website!

Here's how it looks.  Click image to visit the NEW site.

Beech St closed for water works: 29/31th Dec

From the BEO:
____

Dear residents 

We have been informed that Beech Street tunnel will be closed to Westbound traffic between Silk Street and Aldersgate Street for urgent repairs to a water leak. This is planned from 8am on Tuesday 29 December until 12 noon on Thursday 31 December. 

The contractor Thames Water will set up a work site just west of Golden Lane in the Westbound carriageway and remove bollards in the central reservation to accommodate access to the Barbican car parks. Once the required area is excavated, further arrangements will be made to maintain access to premises in the vicinity as far as reasonably practical. 

Thames Water have informed us that there may be a temporary interruption to the water supply on 29 December between the hours of 10am and 12noon. This will affect supplies to the kitchen and the bathroom in some blocks on the estate, so please be mindful of this when you use the water that morning. Please ensure you have your taps in the closed position to prevent any potential for flooding when the water supply is reinstated. 

Apologies for any inconvenience this may cause you. 

Barbican Estate Office

Monday, 21 December 2015

Blake Tower: Newsletter & Residents Meeting on 24th Feb

The new Blake Tower newsletter is out.  They are planning to have a residents meeting on the 24th of February 2016 in the Lilac rooms.   No time given so I guessed 18:30 for the entry in the calendar.

Bloke working on the roof.  Click image for the newsletter.

LWP: It was a piston!

The latest newsletter from the developers of London Wall Place reveals that the large metal object they have been digging out is a huge piston.  Phew.  

Wood St. should be back to normal by the end of January 2016.

Click on the image to read the newsletter.

Just a piston.  Click image to read the newsletter.